Pass the EMC DECA-PowerEdge D-PE-OE-23 Questions and answers with CertsForce

Viewing page 1 out of 2 pages
Viewing questions 1-10 out of questions
Questions # 1:

A customer wants to change the PSU configuration to a 2+0 with PSU2 as the primary. Use the simulator to complete this task in the iDRAC UI.

Question # 1


Expert Solution
Questions # 2:

An administrator has been tasked to create and save replacement of a server configuration with the file

name of "PE-server".

The profile must include the configuration for only the following components:

. NIC

. RAID

. iDRAC

Using the simulator, create and save the replacement with these components.

Question # 2


Expert Solution
Questions # 3:

A system administrator is asked to create an iDRAC shared management port using LOM2 and

create a failover network using LOM3. Use the simulator to accomplish this task.

Question # 3


Expert Solution
Questions # 4:

A customer has relocated one of their Dell PowerEdge platform servers from their main data center to a remote edge location, which uses a different network segment.

Question # 4

Reconfigure the iDRAC network settings with the following information:

. IP Address (CIDR):

192.168.0.120 (/24)

. Gateway: 192.168.0.1

. DNS Server 1: 10.10.0.1

. DNS Server 2: 10.10.0.2


Expert Solution
Questions # 5:

Using the iDRAC UI, generate and save locally a SupportAssist collection with system

information and debug logs only.

Question # 5


Expert Solution
Questions # 6:

The system administrator receives an email notification on April 30, 2022 that a power issue was reported on the Dell PowerEdge R660. Which log entry helps them investigate this issue for that date?

Question # 6

Options:

A.

Under voltage fault detection on power supply 1.


B.

Power supply 2 has failed.


C.

Under voltage fault detected on power supply 2.


D.

Power supply 1 has failed.


Expert Solution
Questions # 7:

The system administrator cannot boot their R660 server. To help troubleshooting, use the iDRAC

Ul to enable capturing the full POST sequence for the next time it attempts to boot.

Question # 7Answer: See the Explanation for Step by Step solution.


Expert Solution
Questions # 8:

Click the Launch Simulator button.

Using the iDRAC UI, what is listed as the Cache Memory Size for the H965i storage controller?

Note: It is necessary to close (x) the simulator window before you can select a response to this question.

Question # 8

Options:

A.

965 MB


B.

8361 MB


C.

1064 MB


D.

8 GB


Expert Solution
Questions # 9:

Under which heading can the user locate Lifecycle logs in the iDRAC Ul?

Options:

A.

System


B.

System event log


C.

Diagnostics


D.

Maintenance


Expert Solution
Questions # 10:

How does the host iDRAC communicate when using the Group Manager feature?

Options:

A.

IPv6


B.

Telnet


C.

SSH


D.

Redfish


Expert Solution
Viewing page 1 out of 2 pages
Viewing questions 1-10 out of questions