Question #: 1
Topic #: 1

You have two branches: Branch1 contains Job1, and Branch 2 contains Job 2. You want to copy Job1 to Branch 2 and preserve the change history when connecting Studio to Talend Administrator Center.

Which method should you use to preserve the change history?


A.

Switch to Branch 1, right-click Job 1, select Copy to branch, and select Branch 2.


B.

Switch to Branch 1, copy the Branch 1 job, switch to Branch 2, and paste the job into Branch 2.


C.

Switch to branch 1, copy the Branch 1 Job, switch to Branch 2, and paste the Job into Branch 2.


D.

Switch to Branch1, copy lob 1, switch to Branch 2, and paste Job 1 over Job 2.