ACME Utilities would like to include their Assets (such as 'Cranes' and 'Excavators') in scheduling along with the Service Resources. As there might be a limited number of Assets for a particular job, they want those to be included in the scheduling process so that asset usage can be optimized.
How can this be achieved?
Submit