Nutanix Certified Services Core Infrastructure Professional (NCS-Core 6.8) NCS-Core Question # 87 Topic 9 Discussion

Nutanix Certified Services Core Infrastructure Professional (NCS-Core 6.8) NCS-Core Question # 87 Topic 9 Discussion

NCS-Core Exam Topic 9 Question 87 Discussion:
Question #: 87
Topic #: 9

For a new AHV cluster installation, a customer has 20 NX-8155 nodes with quad port NICs. The customer wants to meet the following guidelines:

◦Take advantage of all available 10G links

◦Achieve maximum throughput per VM

◦Use of redundant ToR switches

◦Fastest reconvergence during link failure

How should the load balancing be configured on the host?


A.

In Prism Element, update the virtual switch uplink configuration to Active-Active with MAC pinning.


B.

In Prism Element, update the virtual switch uplink configuration to Active-Active.


C.

Use CLI to add the interfaces to bridge bro on all hosts.


D.

Use CLI to configure Balance-TCP on bridge bro.


Get Premium NCS-Core Questions

Contribute your Thoughts:


Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.