Question #: 5
Topic #: 1
An administrator needs to provide leadership with a report showing the timeframe of each step during Recovery Plan failover testing. How should the administrator produce this report?
A.
Filter the Events log in Prism Central for Recovery Plan activity.
B.
Review the built-in execution report from the test failover results.
C.
Generate a custom report within Prism Central Intelligent Operations.
D.
Use ncli on a CVM to query Recovery Plan execution history.
Validation is a core pillar of a robust Business Continuity and Disaster Recovery (BCDR) strategy. Nutanix provides built-in orchestration through Recovery Plans, which automate the failover process of virtual machines between sites. When a " Test Failover " is executed, the system performs all the necessary steps, such as booting VMs in an isolated network, applying network mappings, and executing any custom scripts. To provide visibility into this process, Nutanix generates an automated execution report upon completion of any Recovery Plan task. This report provides a detailed chronological breakdown of every action performed by the orchestrator, including the exact start and end times for each stage (e.g., " Replication Check, " " Power On, " " IP Assignment " ). This built-in reporting is superior to manual event log filtering because it aggregates all related activities into a single, digestible summary that specifically tracks the performance of the DR plan. For leadership and compliance teams, these execution reports serve as documented proof that the RTO (Recovery Time Objective) is achievable and that every orchestrated step was validated during the test window.