The duration of the fire flow for a building of this size and construction type is determined by referencing the fire flow requirements outlined in NFPA 1, Fire Code. For a building of 150,000 ft² (13,935 m²) of Type II (III) construction, the required duration for the fire flow is typically 3 hours to ensure adequate water supply for firefighting efforts.