Netapp Implementation Engineer - SAN ONTAP Exam NS0-521 Question # 13 Topic 2 Discussion

Netapp Implementation Engineer - SAN ONTAP Exam NS0-521 Question # 13 Topic 2 Discussion

NS0-521 Exam Topic 2 Question 13 Discussion:
Question #: 13
Topic #: 2

Click the Exhibit button.

NS0-521 Question 13

A customer is testing a newly installed NetApp AFF A400 all-flash HA storage system. An SVM for FCP with a LUN on Node 1 has been configured, and a server has been connected as shown in the exhibit. For testing, the engineer plans to do a storage failover of Node 1.

After the failover, what is the expected status of the marked path?


A.

Unavailable


B.

Active/Optimized


C.

Active/Nonoptimized


D.

Offline


Get Premium NS0-521 Questions

Contribute your Thoughts:


Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.