Basic Concept: This question tests plan and configure a high availability and disaster recovery (ha/dr) environment in the DP-300 exam context. The correct choice is determined by the exact service boundary and operational requirement stated in the scenario.
Why C is Correct: transactional is part of the availability or recovery design space, but the correct choice must satisfy the specified failover, restore, quorum, RPO, or RTO requirement. This fits the case because the requested outcome is: You need to replicate DB1 to SQlDC1. The selected feature addresses that outcome directly rather than relying on a workaround.
Why A is Wrong: peer-to-pec is part of the availability or recovery design space, but the correct choice must satisfy the specified failover, restore, quorum, RPO, or RTO requirement. It does not meet the failover, restore, quorum, or cross-region continuity target stated in the question, even if it is valid in a different availability design.
Why B is Wrong: merge is part of the availability or recovery design space, but the correct choice must satisfy the specified failover, restore, quorum, RPO, or RTO requirement. It handles a different resilience pattern and would not deliver the failover or recovery behavior required here.
Why D is Wrong: snapshot is part of the availability or recovery design space, but the correct choice must satisfy the specified failover, restore, quorum, RPO, or RTO requirement. It does not meet the failover, restore, quorum, or cross-region continuity target stated in the question, even if it is valid in a different availability design.
Submit