ISTQB Certified Tester Test Automation Engineer CT-TAE Question # 23 Topic 3 Discussion

ISTQB Certified Tester Test Automation Engineer CT-TAE Question # 23 Topic 3 Discussion

CT-TAE Exam Topic 3 Question 23 Discussion:
Question #: 23
Topic #: 3

Your company is new to test automation and as TAE. you have designed a TAS which successfully supports the SUT for the current project.

There are other systems currently in operation which have been tested manually and more systems are planned over the coming years. Based on this success, your company requires test automation be rolled out to other current and future SUTs with consistency being a key objective.

Which of the following is the BEST way to achieve that?


A.

Design a new TAS for each SUT, and manage each one through a dedicated automation support team.


B.

Install the current TAS into a central repository so that other tests on different SUTs use the same version of the TAS.


C.

Check for correct connectivity to internal and external systems to ensure that the TAS has been installed and configured correctly for each SUT.


D.

Develop a tool that keeps track of automation failures across the different SUTs and produces regular reports to stakeholders.


Get Premium CT-TAE Questions

Contribute your Thoughts:


Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.