Evaluate the status of the project against the defined exit criteria. Which of the following options shows the correct status? 2 credits
Criteria A = OK, criteria B = OK, criteria C = OK
Criteria A = NOT OK, criteria B = NOT OK, criteria C = OK
Criteria A = OK, criteria B = NOT OK, criteria C = NOT OK
Criteria A = NOT OK, criteria B = NOT OK, criteria C = NOT OK