Question #: 129
Topic #: 13

Which of the following is the BEST indicator of the effectiveness of a control monitoring program?


A.

Time between control failure and failure detection


B.

Number of key controls as a percentage of total control count


C.

Time spent on internal control assessment reviews


D.

Number of internal control failures within the measurement period