Which of the following are points of electronic power telecommunication?
public network GPRS with low rate and long delay unable to
provision telecontrol, tele indication and telemetering, slow fault locating
high cost for monitoring service carried by operator 4G network
low security and reliability of electric power services carried on public network
incapable of collecting electric consumption information, costly manual meter reading
.
Submit