The OceanStor VIS6600T includes the following devices:
1. Host
2.VIS 6600T
3. Array
4. Fiber switch
Since there is a certain dependency between the above devices, the power-down needs to be performed according to a certain sequence. Which of the following power-off sequences is correct:
Submit