The Redhat Linux Enterprise 6 cp command is used to complete the operating system data migration. What steps are needed to verify the transfer? (Multiple choice.)
A.
Check if the size of the migrated file is the same as the original data.
B.
Check if the number of documents corresponds to the original data
C.
Check if each file with read and write permissions corresponds to the original data
D.
Whether the time for reviewing the case file corresponds to the original data.
Chosen Answer:
This is a voting comment (?). You can switch to a simple comment. It is better to Upvote an existing comment if you don't have anything to add.
Submit