Pre-Summer Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: force70

HPE Network Switching Associate Exam HPE6-A86 Question # 16 Topic 2 Discussion

HPE Network Switching Associate Exam HPE6-A86 Question # 16 Topic 2 Discussion

HPE6-A86 Exam Topic 2 Question 16 Discussion:
Question #: 16
Topic #: 2

A network is configured with two HPE Aruba Networking 2930F switches as the aggregation layer. Each 2930F switch has ten connections. The network has twenty HPE Aruba Networking 2530 access switches connected to both aggregation switches with 1 Gb RJ45 links. Your task is to replace the aggregation switches with HPE Aruba Networking CX 6200 models.

In this scenario, which configuration would provide redundancy using two ports on the access switches to the aggregation layer?


A.

Create a single VSF domain for the CX 6200 and 2530 switches.


B.

Create VSF on the CX 6200 switches and use stacking with the 2530 switches.


C.

Create a LAG on the 2530 switches to connect to both CX 6200 switches.


D.

Create VSF on the CX 6200 switches and a LAG between the CX 6200 and 2530 switches.


Get Premium HPE6-A86 Questions

Contribute your Thoughts:


Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.