You are installing a data center switch.
Which methods are recommended to configure the switch? (Choose two.)
Use out-of-band management with a dedicated management connection
Use in-band management with an IP address and subnet mask that is reachable on the management network
Use out-of-band management and keep the default settings
Use in-band management and configure the AUX0 interface for scheme authentication
Submit