Which of these statements describe an undesirable situation when implementing SPC? (Note: There are 2 correct answers).
The lower Control Limit for the R chart is equal to zero
The Control Limits are wider than the customer specification limits
A process is in Statistical Control before implementation of SPC
Attempt to use SPC for tracking transaction times at a warehouse
Indication of the specification limits on the Control Chart
Submit