A Belt concludes a Lean Six Sigma project with the creation of a Control Plan. At what point can the Control Plan be closed?
Never, a Control Plan is a living document
As soon as the Champion signs off
Within 30 days of the LSS project review team meeting
After the project has been presented at the recognition event