EMC Isilon Solutions and Design Specialist Exam for Technology Architects E20-555 Question # 55 Topic 6 Discussion

EMC Isilon Solutions and Design Specialist Exam for Technology Architects E20-555 Question # 55 Topic 6 Discussion

E20-555 Exam Topic 6 Question 55 Discussion:
Question #: 55
Topic #: 6

An Isilon customer has two 5-node clusters; one for production and one for disaster recovery (DR). The customer's workflows are replicated to the DR cluster through SyncIQ on individual schedules. They shut down their production cluster for a scheduled DR test, failed over to the DR cluster, and continue their DR testing.

Assume both clusters have identical shares, exports, and user authentication. Additionally, assume the client applications have been stopped and the DNS re-pointed. Which SyncIQ Policy method should be used to continue production operations?


A.

Revert


B.

Initiate Manual Failback


C.

Initiate Automated Failback


D.

No change is needed


Get Premium E20-555 Questions

Contribute your Thoughts:


Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.