DES-1121 Exam Topic 1 Question 5 Discussion:
Question #: 5
Topic #: 1

A host is connected to two PowerMax arrays with SRDF/Metro Host l/Os cannot be delivered across the SRDF link. The devices in the SRDF group have been forced into a Not Ready state to the host Which attribute is set on the SRDF group to cause this behavior?


A.

Local Link Domino


B.

Local Auto Link Recovery


C.

Update After Resume Link


D.

Limbo Period