CWNA-106 Exam Topic 2 Question 14 Discussion:
Question #: 14
Topic #: 2

Your consulting firm has recently been hired to complete a site survey for a company. Your engineers use predictive modeling software for surveying, but the company insists on a pre-deployment site visit.

What tasks should be performed as part of the pre-deployment visit to prepare for a predictive survey? (Choose 2)


A.

With a spectrum analyzer, identify the type, amplitude, and location of RF interference sources, if any are present.


B.

Evaluate the building materials at ABC’s facility and confirm that the floor plan documents are consistent with the actual building.


C.

Test several antenna types connected to the intended APs for use in the eventual deployment.


D.

Collect information about the company’s security requirements and the current configuration of their RADIUS and user database servers.


E.

Install at least one AP on each side of the exterior walls to test for co-channel interference through these walls.