Cisco HyperFlex for Systems Engineers 700-905 Question # 6 Topic 1 Discussion

Cisco HyperFlex for Systems Engineers 700-905 Question # 6 Topic 1 Discussion

700-905 Exam Topic 1 Question 6 Discussion:
Question #: 6
Topic #: 1

When cabling a given HX node to the Fabric Interconnect which three actions are required? (Choose three.)


A.

Connect the node to different port numbers on each of the two Fabric Interconnects.


B.

Connect port 1 on the VIC to Fabric Interconnect A.


C.

Connect server port L1 to Fabric Interconnect port L1.


D.

Connect the node to the same port number on each of the two Fabric Interconnects.


E.

Connect server port L2 to Fabric Interconnect port L2


F.

Connect port 2 on the VIC to Interconnect B.


Get Premium 700-905 Questions

Contribute your Thoughts:


Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.