Pre-Summer Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: force70

Cisco Certified Design Expert (CCDE v3.1) 400-007 Question # 30 Topic 4 Discussion

Cisco Certified Design Expert (CCDE v3.1) 400-007 Question # 30 Topic 4 Discussion

400-007 Exam Topic 4 Question 30 Discussion:
Question #: 30
Topic #: 4

While positive feedback loops generally don ' t last long enough to bring down a network completely, they can still last long enough to disrupt traffic flows or to cause the network to converge more slowly than it should.

What are two examples of cases where a positive feedback loop can be long-lived and devastating to the network ' s control plane? (Choose two)


A.

During redistribution of reachability information between multiple control planes


B.

Modifying the flow of traffic through the network by steering traffic based on QoS attributes


C.

When input traffic volumes on an interfaces causes the interface queue to overflow.


D.

The rate at which the information earned in the various control plane protocols changes


E.

When more paths available in any given routing process than are installed in the routing table


Get Premium 400-007 Questions

Contribute your Thoughts:


Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.