350-601 Exam Topic 3 Question 27 Discussion:
Question #: 27
Topic #: 3

350-601 Question 27

Refer to the exhibit. An engineer configures FCoE in a newly installed data center Which configuration must be applied to activate VSAN 100 on VFC 100?


A.

Allow VSAN 100 on interface eth1/12.


B.

Map an FCoE VLAN to VSAN 100.


C.

Configure a VLAN on VFC 100.


D.

Issue the shutdown lan command on VFC 100