350-601 Exam Topic 1 Question 6 Discussion:
Question #: 6
Topic #: 1

A customer data center experiences bandwidth contention that affects the servers connected to the NPV enabled switch The NPV switch is connected to the NPIV switch using two 10 Gb uplinks but the traffic originating front the connected hosts to the core switch exceeds the available bandwidth The engineers decided to add a third uplink to the NPV server to increase the available bandwidth Which set of commands must be used to provision the new uplink?


A.

switch2(config)# npv auto-load-balance disruptive

! uplink to NPV Core

switch2(config-if)# switchport mode np


B.

switch2(config)# port-channel load-balance ethernet source-dest-port

! uplink to NPV Core

switch2(config-if)# switchport mode np


C.

switch2(config)# npv traffic-map server-interface

! uplink to NPV Core

switch2(config-if)# switchport mode npiv


D.

! uplink to NPV Core

switch2(config-if)# switchport mode npiv