Month End Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: simple70

Cisco Designing Cisco Enterprise Wireless Networks (ENWLSD) 300-425 Question # 85 Topic 9 Discussion

Cisco Designing Cisco Enterprise Wireless Networks (ENWLSD) 300-425 Question # 85 Topic 9 Discussion

300-425 Exam Topic 9 Question 85 Discussion:
Question #: 85
Topic #: 9

A customer has two locations named building 1 and building 2 Each location has a Cisco wireless network with these components

Building 1

• 2 Cisco Catalyst 9800 Series Wireless Controllers in a high availability cluster

• 50 Cisco Catalyst 9100 APs

• Contractor SSID in VLAN 100

• Corporate SSID in VLAN 200

• mobility group configured to the building 2 WLCs

Building 2

• 2 Cisco Catalyst 9800 Series Wireless Controllers in a high availability cluster

• 20 Cisco Catalyst 9100 APs

• Contractor SSID in VLAN 300

• Corporate SSID in VLAN 400

• mobility group configured to the building 1 WLCs

The customer has a new security requirement mandating that all contractor SSID traffic must terminate on VLAN 100 on the building 1 WLCs for all locations. Which design approach must the engineer take?


A.

Use the building 2 WLCs as foreign controllers and building 1 as anchor controllers tor the contractor SSID traffic.


B.

Use the building 2 WLCs as anchor controllers and building 1 as foreign controllers for the contractor SSID traffic.


C.

Use the WLCs at both buildings as anchor controllers and tunnel the contractor SSID traffic to building 1.


D.

Use the WLCs at both buddings as foreign controllers and tunnel the contractor SSI0 traffic to building.


Get Premium 300-425 Questions

Contribute your Thoughts:


Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.