The variable overhead expenditure variance is:
The over or under absorbed variable overhead
The difference between the actual hours worked and the standard hours produced, multiplied by the variable overhead absorption rate
The actual hours worked multiplied by the variable absorption rate
The difference between the variable overheads incurred and the flexed budget allowance for variable overheads
Submit