Refer to the exhibit.
Referring to the exhibit, which two statements are true regarding FC-FC routing? (Choose two.)
Switch 3 can have a maximum of two front domains.
Switch 3 can have a maximum of two translate domains.
LSAN zones on Switch 2 and Switch 3 must have the same name.
Switch 1 and Switch 4 fabric IDs must match.
Submit