Prior to cable plant acceptance or system turn-up, standards require that a(n) _______ is used to test the cable plant to ensure it is within the loss budget.


A.

Power meter


B.

LSPM or OLTS (Light source and power meter, optical loss test set)


C.

OTDR


D.

All of the above