In the workload pictured, which sequence flows will be taken after the QA Review is complete?
Both the “Approve” and “Reject” paths will be taken in parallel.
The conditions defined on the sequence flow will determine the path.
The “Approve” flow will always be taken.
The default flow will be always triggered.
The “Reject” flow will always be taken.
Submit