Sally and Sara sell flower pots at their garage sale. Sally motivates Sara mentioning that they will sell a minimum of 22 pots per day if the outside temperature exceeds 60o F. From a sample, whose population is assumed to follow a Normal Distribution, taken for 30 days at 60 degrees or more an average of 18.2 pots per day were sold with a Standard Deviation of 0.9 pots. What is the Z value for this sales process?
With Measurement System Analysis we are concerned with two issues that impact the potential variability of the data. They are ____________ and Accuracy.
Sally bought a blender from her local appliance store. When she changed blades the blender would not function. For the manufacturer this would be categorized as what type of cost?
The relationship between a response variable and one or more independent variables is investigated and modeled by use of __________________.
Handling of warranty returns, process improvement team meetings and rework to meet customer expectations are all examples of business costs that are classified as ___________ .
Assessing process proportion as opposed to evaluating a process with respect to a set target can be done using one or more of these. (Note: There are 2 correct answers).
A Belt working in a supply chain environment has to make a decision to change suppliers of critical raw materials for a new product upgrade. The purchasing manager is depending on the Belt’s effort requiring that the average cost of an internal critical raw material component be less than or equal to $3,800 in order to stay within budget. Using a sample of 38 first article components, a Mean of the new product upgrade price of $3,680, and a Standard Deviation of $120 was estimated. In order to increase the Long Term Z value to 5, what is the maximum long term variation in pricing the Belt can accept for his upgraded critical raw material component?
The reported Cpk for a process with an average of 104 units, a spread of 18 units and upper and lower specification limits of 122 and 96 units would be?
Which of these items contribute to what is necessary for successful Kaizen events?
One of the foundations of Lean Six Sigma is the concept that the output of a process (Y) is influenced by the process inputs (X’s) and is commonly shown as which formula?