An architect is responsible for designing a VMware Cloud Foundation (VCF) Private Cloud solution. During a requirements gathering workshop, the customer supplied the following information:
The solution must support the monitoring of all existing workloads.
There are currently 15,000 virtual machine workloads running within the existing environment.
All infrastructure components will also be monitored by the solution.
The solution must ensure that the 99.9% uptime Service Level Agreement can be met.
The solution must be resilient to a single fault domain failure.
The following logical design decisions have been made within the design:
Deploy the VCF Operations cluster following the High Availability Model.
The following table is from the VCF Operations sizing guide:
Small
Medium
Single-Node Object Maximum
10,000
30,000
Single-Node Max Collected Metrics
1,600,000
5,000,000
Maximum Nodes in a cluster
2
8
Multi-Node Object Maximum
6,000
17,000
Multi-Node Max Collected Metrics
1,400,000
4,000,000
Maximum Objects in a Cluster
12,000
136,000
Maximum Metrics in a Cluster
2,800,000
32,000,000
Maximum Nodes for Continuous Availability per Fault Domain
1
4
Given the information above, which three physical design decisions meet the stated requirements? (Choose three.)
Submit