TheLEED for Homes Rating System (v4)encourages planning for energy-efficient and sustainable technologies during the design phase, particularly for significant electrical loads that impact infrastructure, as addressed in credits likeEnergy and Atmosphere (EA) Credit: Optimize Energy Performance.
According to theLEED Reference Guide for Homes Design and Construction (v4):
EA Credit: Optimize Energy Performance
Design the home to accommodate high-efficiency systems and emerging technologies, such as electric vehicle (EV) charging stations, which require dedicated electrical capacity (e.g., 240-volt circuits) and planning during the design phase to ensure adequate panel capacity and conduit placement.
Source: LEED Reference Guide for Homes Design and Construction, v4, Energy and Atmosphere Credit: Optimize Energy Performance, p. 118.
TheLEED v4.1 Residential BD+Crating system confirms:
EA Credit: Optimize Energy Performance
Electric vehicle charging stations require special consideration in the design phase, including dedicated circuits and infrastructure to support high-voltage, high-amperage loads, ensuring future scalability and energy efficiency.
Source: LEED v4.1 Residential BD+C, Credit Library, accessed via USGBC LEED Online.
Anelectric vehicle charging station(Option D) requires special consideration during the design phase due to its high power demand (typically 240 volts, 30–50 amps), necessitating dedicated circuits, panel capacity upgrades, and potential conduit or wiring planning to avoid costly retrofits.
Why not the other options?
[Reference: LEED Reference Guide for Homes Design and Construction, v4, EQ Credit: Enhanced Ventilation, p. 146., B. 220-volt supply to laundry room: While a 220-volt circuit is common for dryers, it is standard in residential design and does not require special consideration beyond typical electrical planning.Reference: No specific LEED requirement for laundry circuits., C. ENERGY STAR appliances: These focus on efficiency and do not require unique electrical infrastructure beyond standard outlets.Reference: LEED Reference Guide for Homes Design and Construction, v4, EA Credit: High-Efficiency Appliances, p. 136., TheLEED AP Homes Candidate Handbookemphasizes EA credits, including energy-efficient design, and references theLEED Reference Guide for Homes Design and Constructionas a key resource. The exam is based onLEED v4, ensuring the relevance of EV charging considerations., References:, LEED Reference Guide for Homes Design and Construction, v4, USGBC, Energy and Atmosphere Credit: Optimize Energy Performance, p. 118., LEED v4.1 Residential BD+C, USGBC LEED Credit Library, accessed via LEED Online (https://www.usgbc.org/credits)., LEED AP Homes Candidate Handbook, GBCI, October 2024, p. 12 (references study resources and exam scope based on LEED v4)., USGBC LEED for Homes Rating System (v4), available via USGBC website (https://www.usgbc.org/resources/leed-homes-design-and-construction-v4)., LEED v4.1 for Homes, USGBC, accessed via LEED Online, confirming EV charging design needs., ]
Submit