Question #: 12
Topic #: 2

A Mule application includes a subflow containing a Scatter-Gather scope. Within each leg of the Scatter-Gather, an HTTP connector calls a PUT endpoint to modify records in different upstream systems. The subflow is called from inside an Until Successful scope to retry if a transient exception is raised.

A technical spike is being performed to increase reliability of the Mule application.

Which steps should be performed within the Mule flow above to ensure idempotent behavior?


A.

None; the flow already exhibits idempotent behavior


B.

Remove the PUT requests from the Scatter-Gather and perform them sequentially


C.

Change the PUT requests inside the Scatter-Gather to POST requests


D.

Ensure an error-handling flow performs corrective actions to roll back all changes if any leg of the Scatter-Gather fails