The Guided Process template in Redwood (and VBS) allows users to configure a sequence of steps for task flows. The minimum is 1 step (a single task), and the maximum is 50 steps, providing flexibility for complex processes. Option B’s maximum of 10 is too restrictive, Option C’s minimum of 4 is incorrect, and Option D’s maximum of 25 underestimates the capacity.
[References: Oracle Visual Builder Studio Documentation – "Guided Process Template" (https://docs.oracle.com/en/cloud/paas/visual-builder/)., ]
Contribute your Thoughts:
Chosen Answer:
This is a voting comment (?). You can switch to a simple comment. It is better to Upvote an existing comment if you don't have anything to add.
Submit