Oracle Database 19c: RAC, ASM, and Grid Infrastructure Administration 1z0-078 Question # 2 Topic 1 Discussion

Oracle Database 19c: RAC, ASM, and Grid Infrastructure Administration 1z0-078 Question # 2 Topic 1 Discussion

1z0-078 Exam Topic 1 Question 2 Discussion:
Question #: 2
Topic #: 1

You must deploy several Oracle 19c databases on an Oracle Grid Infrastructure Managed Cluster, and are required to have the ability to perform these actions without down time:

1. Apply a Grid Infrastructure interim patch.

2. Apply a Grid Infrastructure Patch Set Update (PSU).

3. Apply a database on-line patch.

4. Apply a Grid Infrastructure patchset.

5. Apply a database patchset.

6. Upgrade Grid Infrastructure from one release to another.

7. Upgrade databases from one release to another.

Your plan is to perform these tasks:

1. Install and configure Oracle Grid Infrastructure on a local file system.

2. Install Oracle Database software on an ACFS file system.

3. Create several RAC One Node databases.

Which of the seven requirements are met by your plan?


A.

1, 2, 3, 4, 5 and 6.


B.

2, 3, 4 and 6.


C.

1, 2, 3 and 4.


D.

2, 3, 4, 5 and 6.


E.

1, 2, 3, 4 and 6.


F.

1, 2, 3, 4, 5, 6 and 7.


Get Premium 1z0-078 Questions

Contribute your Thoughts:


Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.