Weekend Sale Special Limited Time 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: CFsave75

iSQI ISTQB Certified Tester Advanced Level - Test Automation Engineering CTAL-TAE (Syllabus v2.0) CTAL-TAE_V2 Question # 20 Topic 3 Discussion

iSQI ISTQB Certified Tester Advanced Level - Test Automation Engineering CTAL-TAE (Syllabus v2.0) CTAL-TAE_V2 Question # 20 Topic 3 Discussion

CTAL-TAE_V2 Exam Topic 3 Question 20 Discussion:
Question #: 20
Topic #: 3

You work as a TAE for a software vendor that produces bespoke software. Your current project is developing a process control system where data from sensors on the factory floor and human input through a web-based front end undergoes processing on backend platforms. This results in control instructions that are sent to the production line via a message broker.

Your test environment contains all of these components, including the sensors which run in a test harness. These sensors are third-party components that are still under development, so they are often upgraded. The message broker is also a new third-party component which is still receiving regular patches. This requires frequent re-installation of the TAS, which takes significant manual effort, and there have been several occasions where it was not built correctly due to missing components and had to be rebuilt.

Which action is MOST likely to solve this issue with the TAS?


A.

Connectivity checks after installation to verify interoperability between the TAS and the sensors


B.

Automated installation from a central repository where component upgrades can be managed


C.

Stricter documentation and configuration management of the TAS components


D.

Functional testing of relevant TAS components before installation to verify their interoperability with any upgrade to the sensors


Get Premium CTAL-TAE_V2 Questions

Contribute your Thoughts:


Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.