Pre-Winter Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: force70

iSQI ISTQB Certified Tester Advanced Level - Test Automation Engineering CTAL-TAE (Syllabus v2.0) CTAL-TAE_V2 Question # 17 Topic 2 Discussion

iSQI ISTQB Certified Tester Advanced Level - Test Automation Engineering CTAL-TAE (Syllabus v2.0) CTAL-TAE_V2 Question # 17 Topic 2 Discussion

CTAL-TAE_V2 Exam Topic 2 Question 17 Discussion:
Question #: 17
Topic #: 2

You are employed as a TAE on a project to build a purchasing system. The main requirements for the system are:

1) Allow users to enter details of items that they wish to have purchased and, from these details, create a purchase request.

2) Take each purchase request through a workflow that will allow the requestor’s line manager to approve the request, reject it, or return it for clarification/modification.

3) Forward approved requests to the Purchasing Department.

4) Allow purchasers to find the best available supplier and place the request on that supplier as a purchase order.

Requirement 1 has now been delivered and has been satisfactorily tested manually. In parallel, you have developed a TAS so that functional suitability testing can be automated.

The functional suitability testing of Requirement 1 has now been automated as fully as possible. A change to add audit logging of user activity is planned but has not yet been made. After a small change to the UI code, the last regression run contained a significant number of unexplained test failures. At the point each test stopped, the actual and expected results showed no discrepancies. In each case, the run was able to continue with the next test in the suite. Preliminary investigation showed that the points at which these tests stopped had nothing obvious in common.

Which option below contains the BEST next steps to investigate this?


A.

Analyze all available log information with the aim of finding an unreported verification discrepancy in the scripts


B.

Analyze all available log information with the aim of finding a defect in the way that the TAS runs tests


C.

Analyze all available log information with the aim of finding a test environment outage


D.

Add user activity logging to the SUT, then repeat the test run so that correlation IDs are available


Get Premium CTAL-TAE_V2 Questions

Contribute your Thoughts:


Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.