When using Huawei OceanStor BCManager eReplication DR management software to implement DR protection, you can perform DR drills periodically. Which of the following operations are required during DR drills?
Huawei defines the DR-drill procedure as: stop the production application and unmap hosts/LUNs → synchronize incremental data → switch the replication relationship → map a LUN → start DR applications → test whether applications start successfully.
Therefore, A, B, and D are the required operations.
Incremental synchronization ensures that the DR copy has the latest protected changes before the service transition. The replication relationship is then switched so the DR-side storage resources can assume the required service role. After the target LUNs are mapped, DR applications are started and tested to confirm that the recovery environment can actually carry the business workload.
Option C is different. A recovery plan must already be defined as part of BCManager DR configuration and orchestration; formulating the recovery plan is not an execution step performed every time a DR drill runs. The course separately describes eReplication configuration as creating protection groups and recovery plans before recovery operations are executed.
A DR drill therefore validates an existing DR design and recovery plan rather than redesigning that plan during each test.
Study Guide Topics: Data Protection Solution → OceanStor BCManager eReplication → DR Management → Recovery Plan → DR Drill → Planned Service Migration.