Two ArubaOS-CX switches ate part of a Virtual Switching Extension (V5X) fabric. Is this a guideline for configuring the switches' link-up delay settings?
Solution: Set the link-up delay timer based on the number of MAC forwarding, ARP, and routing table entries.
Submit