HPE0-V18 Exam Topic 3 Question 24 Discussion:
Question #: 24
Topic #: 3

A customer has three workloads to place across a solution assembled from HPE and alliance partner elements: a control system that must respond within milliseconds at a plant, a reporting system used by head office once a month, and a records archive subject to a residency rule and rarely accessed. Which placements follow from the constraints as stated? (Choose two.)


A.

The control system must run at the plant.


B.

The reporting system and the archive both run centrally, with only control at the plant.


C.

The archive sits where its residency rule can be demonstrated.


D.

The reporting system runs at the plant alongside the control system.


E.

The archive runs at the plant, since it is rarely accessed and needs little capacity.


Get Premium HPE0-V18 Questions

Contribute your Thoughts:


Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.