Question #: 8
Topic #: 1

Your customer plans to setup an HPE Synergy solution based on SY480 Gen10 compute nodes with the following connectivity options - SAS connectivity installed in the first fabric - FC connectivity Installed In the second fabric - Ethernet connectivity installed in the third fabric.

Which statement regarding this setup is true?


A.

Each compute node must have at least 768GB of memory installed


B.

Interconnect modules that provide SAS connectivity should be moved to the third fabric


C.

Each interconnect module in each fabric must be properly licensed in HPE OneView


D.

Compute nodes must have a second CPU installed to access the second fabric.