300-610 Exam Topic 8 Question 70 Discussion:
Question #: 70
Topic #: 8

300-610 Question 70

Refer to the exhibit. A 4x10G Fibre Channel has been configured between SW1 and SW2 to carry backup traffic sourced to and from the SAN. An engineer noticed that 10G Link 1 is being used more heavily than the other links within the port channel. Which action must the engineer take on the two switches to ensure that the traffic uses all available links between SW1 and SW2?


A.

Configure exchange-based load-balancing.


B.

Configure flow-based load-balancing.


C.

Configure src-dst-ip-based load-balancing.


D.

Configure dst-mac-based load-balancing.