Cisco Designing Cisco Data Center Infrastructure (DCID) 300-610 Question # 26 Topic 3 Discussion

Cisco Designing Cisco Data Center Infrastructure (DCID) 300-610 Question # 26 Topic 3 Discussion

300-610 Exam Topic 3 Question 26 Discussion:
Question #: 26
Topic #: 3

Refer to the exhibit.

300-610 Question 26

Fiber links are provisioned directly between the spine and leaf switches in the given LAN topology A/30 prefix has been configured over each fiber link to provide underlay connectivity for a VXLAN network. The network-engineering team must update the network configuration to provide the shortest possible convergence time if a fiber link is cut. Which action must the team take to meet the requirement?


A.

Configure the /30 links as OSPF point-to-point networks


B.

Enable BFD on the/30 links


C.

Enable UDLD on the GO links


D.

Configure ECMP on the /30 links


Get Premium 300-610 Questions

Contribute your Thoughts:


Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.