Question #: 17
Topic #: 2

Refer to the exhibit A Cisco engineer is configuring Cisco Nexus 7000 Series Switches. To simplify initial configuration verification and vPC+/HSRP troubleshooting, the engineer configures the primary vPC+ peer device with the FHRP active router highest priority. The primary FHRP device responds to ARP requests, even though the secondary vPC+ device also forwards the data traffic. Which configuration enables the Layer 3 connectivity from each vPC* peer device?


A.

Configure a VLAN network interlace for the same VLAN from both devices.


B.

Ensure that the enhanced Layer 2 license has been installed.


C.

Manually configure virtual MAC addresses tor any FHRP protocol.


D.

Set a restore timer that delays the vPC+ restart.