Big 11.11 Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: simple70

Cisco Designing Cisco Enterprise Wireless Networks (ENWLSD) 300-425 Question # 14 Topic 2 Discussion

Cisco Designing Cisco Enterprise Wireless Networks (ENWLSD) 300-425 Question # 14 Topic 2 Discussion

300-425 Exam Topic 2 Question 14 Discussion:
Question #: 14
Topic #: 2

An engineer is implementing a wireless design for a service provider. The design includes a Catalyst 9800, a stack of two Catalyst 9300X-

48HX switches, and 9166 APs. Each AP must be named using the Floor-439412509-01X sting where X is the area number. The engineer wants

to connect the APs to the switch stack using POE. How many APs must the engineer connect to the stack so the APs run using full functionalities?


A.

all ports on switch 2 of the stack


B.

all ports on switch 1 of the stack


C.

all ports of the switches


D.

half ports per switch


Get Premium 300-425 Questions

Contribute your Thoughts:


Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.